See all services

DisclosureFrom your inventory to your reports

When a customer, a bank or your parent company sends you an environmental questionnaire, almost everything they ask for is already in your inventory. Emetrix arranges it in the right format and lets you review every figure before you declare it.

ClimateEnergyWaterBiodiversityWasteMaterials

We do not sign your report or replace your judgement: we prepare the draft from your own data, with the traceability to defend every figure. What you declare is your call.

The problem

The questionnaire always arrives at the worst moment

Answering a request for environmental information usually means weeks of rebuilding by hand what you already calculated, in a different format, unsure whether the number you are entering matches the one you entered last year.

1

The data exists, but it is scattered across spreadsheets, reports and different people's heads.

2

Every framework asks for the same figure with a different cut, unit and base year.

3

If someone asks where a figure came from, reconstructing it takes longer than calculating it did.

How it works

The draft builds itself, you review it

The module reads the inventory you already closed and proposes an answer for each item. It does not invent: if a figure is missing, it says so.

app.emetrix.com

GRI Standards 2026

Your company · reporting year 2025

202320242025
40%

questions with a value

69/172 with data · 13,816.26 t CO₂e

57 auto-filled awaiting your review
Auto-filled 57Confirmed 12Pending 103

Modules

GRI 102

Climate change

23/37 · 62%

GRI 103

Energy

10/14 · 71%

GRI 303

Water and effluents

10/15 · 67%

GRI 306

Waste

8/14 · 57%

GRI 101

Biodiversity

7/18 · 39%

GRI 301

Materials

1/5 · 20%

A report in preparation · demonstration data
01

Pick the framework and the year

Select which request you are answering and which closed reporting year to use as the basis.

02

It fills in from your data

Each item is filled with the figure that came out of your inventory, in the unit and breakdown that framework asks for. Anything without backing is flagged as missing.

03

Review, adjust and export

Edit whatever you want, add the narrative in your own voice, and take the content ready to place wherever you have to submit it.

What gets filled in

The topics where your inventory already holds the answer, calculated and traced, in the cut each request asks for — among them CDP's questionnaires and GRI's topic disclosures.

Climate

Scopes 1, 2 and 3 broken down by category, Scope 2 under both methods, and the comparison against your base year.

Energy

Consumption within and outside the organization, renewable and non-renewable, broken down by operating unit, plus energy intensity.

Water

Withdrawal, discharge and consumption per facility, with the detail for areas under water stress.

Biodiversity

Sites in protected or high conservation value areas, land use change, and surrounding risk.

Waste

Generation by type and destination, diverted and not diverted from final disposal.

Materials

Materials and packaging used, with their origin and their end-of-life disposal.

Why it pays to have this settled

Requests for environmental information are no longer one-off: today they arrive from several directions at once.

Your customers already ask

Large companies need their suppliers' figures to close their own Scope 3. Answering quickly and with backing keeps you on the shortlist.

Financing looks at it

Banks and funds have built environmental criteria into their analysis. Having the information organized and traceable changes the conversation.

The rebuilding work disappears

What used to be weeks of spreadsheets becomes a review. And next year you start from what you already answered.

Got a questionnaire and no idea where to start?

Write to us and we will look at what they are asking for and how much of it you can already answer with what you measure today.